Public Bids

 

  Download and print the following Request for bid. 

    Project 2017-R&B-Var-001

REQUEST FOR BID 

Seal Bids will be accepted on the following project (Project 2017-R&B-Var-001) until 12:00 Noon, June 23, 2017 and will be opened at the Public Bid opening to be held in the Commissioner’s Office and will be recorded at that time. Seal Bids can be submitted to: County Manager, 100 Courthouse Square, PO Box 112, Lyons, GA. 30436. The Board of Commissioners reserves the right to accept or reject any and all bids. All bids shall include providing all labor, equipment, and materials or other things necessary to  complete the project. Project will require a milling  machine.

Various patching of approximately 40-45 patches of various widths and lengths on approximately 11 roads. Roads and patching requirements listed on Schedule A & B.

Mill and inlay 5 bridges for smooth transition for SO foot apron on each side of the bridge. Milling should be 2 inches below bridge deck. Bridges are located on:

Old Normantown Road – 2 Bridges Vidalia-Cedar Crossing road – 3 bridges

Note: Contractor is responsible for all traffic control and the posting of appropriate construction signs as required by MUTCD

The successful bidder will be GDOT Certified and submit certification of workers’ comp., liability insurance and e-verify compliance when the bid is awarded.

The Contractor shall be responsible for attending pre-construction conference after award of bid and completing the project within 60 days of Notice To Proceed for Schedule A and 120 days on Notice to Proceed for Schedule B.

PROJECT 2017-R-VAR-001

SCHEDULE A

34 McNatt Falls RD 114 x 5 5″ asphalt
N/A 6 X 4 311 Mill & Inlay
628 McNatt Falls RD 9 x 4 3″ Mill & Inlay
762/763 McNatt Falls RD 31 x 4 3″ Mill & Inlay
  10 x 16 3″ Mill & Inlay
By Guard Rail 60 x 10 Tear-out  – 8″ GAB & 4″ of Asphalt
        Removed dirt can be placed on

backside of rail on river side.

A2- Center Subdivision                       2×2 Clean Out and 3″ of asphalt

A3 – Pinewood Subdivision

Corner of Ridgewood Ct/Pinewood 2 x 20 3″ Mill & Inlay
Corner of Ridgewood CT/Pinecrest Ct. 2 x 2 3″ Mill & Inlay
Corner of Pinewood CT/Centerbrook Ct 5 x 5 3″ Mill & Inlay
  5 x 5 3″ Mill & Inlay

A 4 – Marshall Pittman Road  

5 X 5 311 Mill & Inlay
5 X 5 311 Mill & Inlay
AS – Scott 

6

Drive

x

 

25

 

4″ GAB & 2″ of Asphalt

10 x 90 6′ GAB & 4′ of Asphalt
10 x 60 6′ GAB & 4′ of Asphalt

PROJECT 2017-R-VAR-001 SCHEDULE A

SCHEDULE  B  – Complete within 120Days of  Notice to Complete

 

SIZE (FT)

81  – C.V. Mosley  

2

 

X

 

5

 

Patch

  144 X 22 1 1/ 211   Overlay
  40 X 11 Patch
  128 X 22 4″ GAB & 2″ Asphalt
        Pack Asphalt down centerline
 

82 Dewayne Dykes Road

66 X 22 4″ GAB & 2″ of Asphalt
83 Old Normantown Road:        
  14 X 22 3″ Mill & Inlay
  78 X 11 3″ Mill & Inlay
  15 X 11 3″ Mill & Inlay
  20 X 11 3″ Mill & Inlay
  10 X 12 3″ Mill & Inlay
  4 X 2 3″ Mill & Inlay
  4 X 13 3″ Mill & Inlay
  360 X 11 3″ Mill & Inlay
  48 X 22 311 Mill & Inlay
  46 X 11 311 Mill & Inlay
  100 X 11 311 Mill & Inlay
  76 X 11 3″ Mill & Inlay
  20 X 11 3″ Mill & Inlay
  101 X 11 3″ Mill & Inlay
  20 X 11 3″ Mill & Inlay
BRIDGES:        
Old Normantown Road – 2 Bridges        
Vidalia-Cedar Crossing Road – 3 bridges